Optimizing Construction Engineering Management Using Metaheuristic Methods and Bayesian Networks

Author:

Jakubczyk-Gałczyńska Anna1ORCID,Siemaszko Agata1,Poltavets Maryna2

Affiliation:

1. Faculty of Civil and Environmental Engineering, Gdansk University of Technology, 80-233 Gdansk, Poland

2. Department of Industrial and Civil Construction, Zaporizhzhia National University, 69600 Zaporizhzhia, Ukraine

Abstract

The construction of buildings invariably involves time and costs, and disruptions impact ongoing construction projects. Crisis situations in management strategies, structural confusion, and financial miscalculations often arise due to misguided decision-making. This article proposes a method that combines the learning of Bayesian Networks and heuristic techniques to optimize decision-making processes in construction scheduling. As an innovative approach in order to enhance construction management, the functioning of biological, molecular, and physical objects and nervous systems is considered, applying bionic features to mimic their efficiency and precision, thereby optimizing construction processes and improving coordination and decision-making. Bayesian Networks are used for probabilistic analysis, and heuristic methods guide quick decision-making. The results demonstrate the effectiveness of Bayesian Networks and heuristic methods in data analysis and decision-making in construction engineering. The developed algorithm can be successfully applied to both erecting and planning construction projects.

Funder

Gdańsk University of Technology

Publisher

MDPI AG

Reference37 articles.

1. Gill, F.E., Murrey, W., and Wright, M.A. (1981). Practical Optimization, Systems Optimization Laboratory, Department of Operation Research, Stanford University.

2. Effective Concepts of Harmonious Management of Production Systems;Arutiunian;Int. J. Comput. Sci. Netw. Secur.,2021

3. Çevikbaş, M., and Işık, Z. (2021). An Overarching Review on Delay Analyses in Construction Projects. Buildings, 11.

4. Faten Albtoush, A.M. (2024). Risk of Delay in Construction Projects. Risk Management in Construction—Recent Advances, IntechOpen.

5. Managing supply chain risks and delays in construction project;Panova;Ind. Manag. Data Syst.,2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3