Risk of Delay in Construction Projects

Author:

Faten Albtoush A.M.

Abstract

The construction sector is considered the most important sector, as it contributes to raising the country’s economy. Therefore, it is necessary to search for the obstacles. One of these obstacles is the delay, as the project is rarely completed within the planned period. Among the most prominent reasons for this delay are change orders, financial problems for the owner, and slow decision-making on the part of stakeholders. This delay led to various risks, like financial risks, which were represented in exceeding the cost of the project as well as the other in operating the facility and benefiting from the planned benefit. The risk identification process starts with Existence of uncertainty, Preliminary checklist, Risk events consequence scenarios, Logical categorization scheme, Risk mapping, and finally is risk category summary. Therefore, these risks should be analyzed during the planning stage, which can reduce risks during the implementation of the project must be developed. Also, money must be involved in the planning process to be able to fully understand the owner’s perception of the project. The provision of the required budget for the project in the early stages ensures the availability of financial liquidity and thus does not delay payment to the contractor.

Publisher

IntechOpen

Reference23 articles.

1. Tawfek AM, Bera DK. Delay in construction projects: Types, causes and effects. Project Management Practices, Chief Editor. 2018. pp. 184-192

2. Majid IA. Causes and Effect of Delays in Aceh Construction Industry. Malaysia: Masters of Science in Construction Management: Universiti technologi Malaysia; 2006

3. Desai M, Bhatt R. Critical causes of delay in residential construction projects: Case study of Central Gujarat region of India. International Journal of Engineering Trends and Technology. 2013;4(4):762-768

4. Doraisamy SV, Akasah ZA, Yunus R. An overview on the issue of delay in the construction industry. In: CIEC 2014: Proceedings of the International Civil and Infrastructure Engineering Conference 2014. Singapore: Springer; 2015. pp. 313-319

5. Thorat S, Khandare MA, Kanase AK. Identifying the causes and effects of delay in residential projects. International Research Journal of Engineering and Technology (IRJET). 2017;4:2993-2996

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3