Abstract
Assessing the implementation of environmental management plans (EMPs) in construction projects is crucial for meeting environmental sustainability goals and reducing potential adverse impacts. By using performance indicators (PIs), stakeholders can objectively measure the performance of EMP implementation, identifying areas of success and areas that may require improvement. Therefore, this study aims to examine the PIs for assessing EMP implementation in water supply construction projects, using Saudi Arabia as a case study. Data from semi-structured interviews and a systematic literature review were used to develop a potential list of PIs. Then, the PIs were used to create a survey and distributed to industry professionals. Data from 112 respondents were analyzed using mean ranking analysis, the normalization method, exploratory factor analysis (EFA), and fuzzy synthetic evaluation (FSE). Eighteen critical PIs for assessing EMP implementation in water supply construction projects were identified, including public safety, road safety hazards, construction waste, clogged drainage, irregular flooding, the spilling of chemical substances, slope failures, soil erosion, landslide occurrence, increased schedule waste, changes in the color of bodies of water, oil/fuel spills, restricted site accessibility, the smell of run-off water, traffic accidents on construction sites, the spread of disease, changes in the color of run-off water, and overflowing silt traps. The EFA revealed that PIs can be grouped into three underlying constructs: fluid-related indicators, health and safety-related indicators, and site environment-related indicators. The FSE results confirmed that all PIs are between moderately critical to critical. This study’s significance lies in its examination of PIs that aim to improve the environmental performance of water supply construction projects. Understanding which indicators are most effective allows for targeted improvements, helping to minimize negative environmental impacts and ensuring sustainable practices. Finally, this study is a pioneer in examining the critical PIs for assessing EMP implementation in water supply construction projects.
Funder
Deanship of Scientific Research at Imam Mohammad Ibn Saud Islamic University
Reference83 articles.
1. Worldbank (2023, September 19). Available online: https://www.worldbank.org/content/dam/Worldbank/document/Kyrgyzstan-EMF-health-project.pdf.
2. Maund, K., Gajendran, T., and Brewer, G. (2018). Key issues for implementation of environmental planning policy: Construction management practice. Sustainability, 10.
3. Attitudinal and behavioural approaches to improving waste management on construction projects in Australia: Benefits and limitations;Udawatta;Int. J. Constr. Manag.,2015
4. The environment: The fourth construction project objective?;Ofori;Constr. Manag. Econ.,1992
5. United Nations Environment Programme (2021). 2021 Global Status Report for Buildings and Construction: Towards a Zero-Emission, Efficient and Resilient Buildings and Construction Sector, UN.