Performance Indicators for Assessing Environmental Management Plan Implementation in Water Projects

Author:

Farouk Abdelrahman M.1ORCID,Radzi Afiqah R.2,Romali Noor Suraya1,Farouk Mohamed34ORCID,Elgamal Mohamed3,Hassan Raouf35ORCID,Omer Mazen M.16ORCID,Rahman Rahimi A.17ORCID

Affiliation:

1. Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah, Kuantan 26300, Malaysia

2. Faculty of Built Environment, University of Malaya, Kuala Lumpur 50603, Malaysia

3. Civil Engineering Department, College of Engineering, Imam Mohammad Ibn Saud Islamic University (IMSIU), Riyadh 11432, Saudi Arabia

4. Faculty of Engineering, Ain Shams University, Cairo 11517, Egypt

5. Civil Engineering Department, Faculty of Engineering, Aswan University, Aswan 81542, Egypt

6. Department of Civil Engineering, Higher Institute of Science and Technology, Tiji, Libya

7. Faculty of Graduate Studies, Daffodil International University, Dhaka 1341, Bangladesh

Abstract

This research aims to examine the performance indicators that are crucial for assessing the implementation of environmental management plans (EMPs) in water projects. To achieve this aim, a questionnaire survey, integrating a systematic literature review (SLR), was used to identify the initial performance indicators. Subsequently, ten interviews with environmental professionals were carried out to uncover additional indicators not identified by the SLR. Following the survey design and pilot study of the survey, the data collection resulted in 112 valid responses from environmental professionals engaged in water projects in Saudi Arabia. The data analysis encompassed reliability tests, mean ranking, normalized mean analysis, exploratory factor analysis (EFA), and partial least squares structural equation modeling (PLS-SEM). The normalized mean analysis highlighted 13 critical parameters among 39 for further investigation. The EFA disclosed three underlying constructs: environmental impact indicators, operational and safety indicators, waste management, and public safety indicators. PLS-SEM was used to validate the relationship between these indicators and the successful implementation of EMPs. The results indicate that all three underlying constructs positively influence the effective execution of such plans. This is the first study to model the relationships of the performance indicators in water projects. The study’s findings underscore the importance of developing precise performance indicators tailored to diverse construction projects that are mainly focused on water facility construction. The identified performance indicators offer significant insights for policymakers, practitioners, and researchers and provide a solid foundation for the advancement of knowledge in the field of environmental management.

Funder

Imam Mohammad Ibn Saud Islamic University

Publisher

MDPI AG

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3