1. Abudayyeh O. (1997). “Safety issues in bridge demolition projects: A case study.” PM network Proj. Mgmt. Inst. Sylva N.C. 11(1).
2. Barth F. G. (1993). “Engineered demolition of earthquake-damaged bridge structures.” Concrete construction . 38(7) Aberdeens Group Addison Ill. 480–486.
3. Bradley J. F. (1988). “Hydro-demolition speeds bridge deck rehabilitation.” Concrete Int . 10(4) Am. Concrete Inst. Detroit Mich 52–53.
4. Brecher A. (1995). “Infrastructure: A national priority.” SWE Am. Soc. of Women Engrs. Nov./Dec.
5. “Bridge deck rehab zips along with high pressure water jet.” (1986). Highway & heavy construction 129(8) WD Cahners Publishing Co. Denver Colo. 46–47.