Author:
Zhong Zheng,Zhang Yue,Chen Weidong,Yang Jing,Wang Qiuping,Dai Zhicheng
Abstract
Abstract
Bridge demolition project involves a variety of factors, belonging to the category of multi-factor decision-making. How to choose a reasonable demolition scheme from a variety of schemes is a problem to be considered. This paper is to use multi-factor decision-making method to optimize and select bridge demolition scheme. Taking the formulation of a certain bridge demolition scheme in China as an example, this paper demonstrates in detail the process of optimization selection and design as well as the result of the bridge demolition scheme. AHP method is used to decompose each factor of bridge demolition to form a hierarchical structure. On this basis, TOPSIS method is used to calculate the proximity between each demolition scheme and the positive ideal solution. Finally, the bridge demolition scheme is selected according to the calculation value.
Reference5 articles.
1. Concrete bridge demolition methods and equipment;Abudayyeh;Journal of Bridge Engineering,1998
2. Blasting Demolition of Reinforced Concrete Double-curvature Arch Bridge under Complex Surroundings;Cheng;Blasting,2008
3. An approach using multi-factor combination to evaluate high rocky slope safety;Su;Natural Hazards and Earth System Sciences,2016
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献