1. Cassidy M. J. and Han L. D. (1992). “Predicting vehicle delays and queue lengths on two-lane highways during maintenance activity.” Proc. TRB 71st Annual Meeting Transportation Research Board Washington D.C.
2. Chen C. H. and Schonfeld P. (2002). “Work zone lengths for a four-lane road with an alternate route.” TSC Rep. No. 2002-21 Univ. of Maryland College Park Md.
3. Optimal Work Zone Lengths for Four-Lane Highways
4. Dudek C. L. and Richard S. H. (1982). “Traffic capacity through urban freeway work zone in Texas.” Transportation Research Record 869 Transportation Research Board Washington D.C. 14–18.
5. Gerlough D. L. and Huber M. J. (1975). “Traffic flow theory.” Spec. Rep. No. 165 Transportation Research Board National Research Council Washington D.C. 49–70.