Model for Understanding, Preventing, and Resolving Project Disputes
Author:
Affiliation:
1. Member, ASCE
2. Perf. Improvement Coordinator, DPR Constr., Inc., Redwood City, CA 94065; PhD, Stanford Univ., Dept. of Civ. Engrg., Terman Engrg. Ctr., Stanford, CA 94305-4020.
3. Dir., Lean Constr. Inst., Box 1003, Ketchum, ID 83340.
Publisher
American Society of Civil Engineers (ASCE)
Subject
Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering
Link
http://ascelibrary.org/doi/pdf/10.1061/%28ASCE%290733-9364%282001%29127%3A3%28223%29
Reference19 articles.
1. ASCE Technical Committee. ( 1987). “Avoiding and resolving disputes in underground construction.” Rep. on Contracting Practices of the Underground Technol. Res. Council New York.
2. Ashley D. Dunlop J. and Parker M. ( 1989). “Impact of risk allocation and equity in construction contracts: An overview of indemnity consequential damages differing site conditions and delay clauses.” Source Document 44 Construction Industry Institute Austin Tex.
3. Shielding Production: Essential Step in Production Control
4. Birrell G. S. ( 1981). “The informal organization which manages the construction process.” Proc. 3rd Symp. on Org. and Mgmt. of Constr. CIB-W65 Conseil International de Batiment pour la Recherche l'Etude et la Documentation.
5. Brett J. Goldberg S. and Ury W. ( 1990). “Designing systems for resolving disputes in organizations.” Am. Psychologist 45(2).
Cited by 132 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Assessment of the Critical Dispute Factors in Public–Private Partnership Infrastructure Projects;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-11
2. Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method;Journal of Construction Engineering and Management;2024-07
3. Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance;Buildings;2024-01-25
4. Dispute Classification and Analysis: Deep Learning–Based Text Mining for Construction Contract Management;Journal of Construction Engineering and Management;2024-01
5. A Study on Terms Used in Constructıon Contracts;Avrasya Terim Dergisi;2023-12-29
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3