Development of a Proactive Preventive Late Payment and Underpayment Solution Model for the Construction Industry

Author:

Judi Siti Suhana1ORCID,Mustaffa Nur Emma2

Affiliation:

1. Dept. of Quantity Surveying, Faculty of Architecture, Planning and Surveying, Universiti Teknologi Majlis Amanah Rakyat, Shah Alam, Selangor 40450, Malaysia (corresponding author). ORCID: .

2. Associate Professor, Dept. of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, Skudai, Johor 81310, Malaysia.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Law,Engineering (miscellaneous),Safety, Risk, Reliability and Quality,Civil and Structural Engineering,Building and Construction

Reference44 articles.

1. Financial-related causes contributing to project delays

2. Abandoned Housing Projects in Malaysia and the Prospect of DP: An Overview

3. Akinsiku O. and O. Ajayi. 2016. “Effects of delayed payment of contractors on construction project delivery in Nigeria.” In Proc. Construction Building and Real Estate Research Conf. of the Royal Institution of Chartered Surveyors 1–9. Toronto: Association with George Brown College.

4. The significant factors causing delay of building construction projects in Malaysia

5. Amoako K. B. 2011. “The effect of delayed payment on cash flow forecasting of Ghanaian road contractors.” Bachelor’s thesis Institute of Distance Learning Kwame Nkrumah Univ. of Science and Technology.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3