Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project

Author:

Moret Yvonne1,Einstein Herbert H.2

Affiliation:

1. Former Research Assistant, Dept. of Civil and Environmental Engineering, Massachusetts Institute of Technology, 77 Massachusetts Ave., Cambridge, MA 02139 (corresponding author).

2. Professor of Civil and Environmental Engineering, Dept. of Civil and Environmental Engineering, Massachusetts Institute of Technology, 77 Massachusetts Ave., Cambridge, MA 02139.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering

Reference51 articles.

1. Anderson S. D. Molenaar K. R. and Schexnayder C. J. (2007). “Guidance for cost estimation and management for highway projects during planning programming and preconstruction.” NCHRP Rep. No. 574 Transportation Research Board National Cooperative Highway Research Program Washington DC.

2. Defining Triangular Probability Distributions from Historical Cost Data

3. Cario M. C. and Nelson B. L. (1997). “Modeling and generating random vectors with arbitrary marginal distributions and correlation matrix.” Technical Rep. Northwestern Univ. Evanston IL.

Cited by 34 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3