1. , , & , (1990). Review of removal, containment, and treatment technologies for remediation of contaminated sediment in the Great Lakes (Miscellaneous Paper EL-90-25). Chicago, IL: U. S. Army Corps of Engineers and the U. S. Environmental Protection Agency.
2. (1993). Bayou dredging work plan and bayou channel fill work plan. Slidell, LA: Author.
3. Blasland, Bouck, & Lee, Inc. (BBL). (1993). Manistique Harbor 1993 sediment survey. Manistique, MI: Edison Sault Electric Company and Manistique Papers, Inc.
4. Blasland, Bouck, & Lee, Inc. (BBL). (1994a). Draft river and sediment investigation (RSI) phase II report (Vol. 1). Syracuse, NY: Author.
5. Blasland, Bouck, & Lee, Inc. (BBL). (1994b). Engineering evaluation/cost analysis (Vol. 1). Manistique, MI: Edison Sault Electric Company and Manistique Papers, Inc.