1. Cominco's Trail Zinc Pressure Leach Operation;Martin;CIM Bulletin,1985
2. B.H. Johnston B.N. Doyle “Start Up and Operation of the Kidd Creek Zinc Sulphide Pressure Leaching Plant,” Minerals and Metallurgical Processing, February 1986, 1-7
3. Zinc Pressure Leaching at the Ruhr-Zink Refinery;Ozberk;Hydrometallurgy,1995
4. M.J. Brown E.T. deGroot M.G. Heximer A.J. Karges G.N. Masuch C.M. Okumura “Zinc Capacity Increase at Cominco's Trail Operations,” Zinc and Lead Processing, J.E. Dutrizac, J.A. Gonzalez, G.L. Bolton and P. Hancock, Eds., Canadian Institute Mining, Metallurgy and Petroleum, Montreal, Canada, 1998, 41-54
5. Starting up the Sherritt Zinc Pressure Leach Process at Hudson Bay;Collins;JOM,1994