1. E. Austin and W.E. McFadden, “The Electrolytic Zinc Plant of the Hudson Bay Mining & Smelting Co., Limited,” Trans. Can. Inst. Mining Met., 59 (1956), pp. 208–223.
2. E.G. Parker and S. Romanchuk, “Pilot Plant Demonstration of Zinc Sulfide Pressure Leaching,” Lead-Zinc-Tin’ 80, ed. J.M. Cigan, T.S. Mackey, and T.J. C’Keefe (New York: AIME, 1980), pp. 407–425.
3. D.W. Ashman and W.A. Jankola, “Recent Experience with Zinc Pressure Leaching at Cominco,” Lead-Zinc’ 90, ed. T.S. Mackey and R.D. Prengaman (Warrendale, PA: TMS, 1990), pp. 253–275.
4. B.H. Johnston and B.N. Doyle, “Start Up and Operation of the Kidd Creek Zinc Sulfide Pressure Leaching Plant,” Minerals and Metall. Processing (February 1986), pp. 1–7.
5. A.C. Mollison and G.W. Moore, “Sulfide Pressure Leaching at Kidd Creek,” Lead-Zinc’ 90, ed. T.S. Mackey and R.D. Prengaman (Warrendale, PA: TMS, 1990), pp. 277–291.