1. Concurrency: Practice and Experience 10403108 10969128 2000 12 15
2. The Environment Agency. Lessons learned: Autumn 2000 floods. http://www.environmentagency.gov.uk/commondata/acrobat/126637 [16 October 2007].
3. Cascading model uncertainty from medium range weather forecasts (10 days) through a rainfall‐runoff model to flood inundation predictions within the European Flood Forecasting System (EFFS);Pappenberger;Hydrology and Earth System Science,2005
4. Beven K, Romanowicz R, Pappenberger F, Young PC, Werner M. The uncertainty cascade in flood forecasting. Proceedings of the ACTIF Meeting: Innovation, Advances and Implementation of Flood Forecasting Technology, Tromsø, 2005; 33: [CD‐ROM]. Available at: http://www.actif‐ec.net/conference2005/proceedings/PDF%20docs/Session_04_Uncertainty/Beven_Keith.pdf.
5. River gauging using PIV techniques: A proof of concept on the Iowa river;Creutin;Journal of Hydrology,2003