1. Islam, Md. Mazedul, Khan Adnan Maroof, and Uddin Md. Zulhash. (2013). Elimination of Non Productive Activities is A Must in Cost, and Time Savings in the Sewing Section of Apparel Industry. International Journal of Engineering and Applied Sciences, 1(4): 113-119.http://eaas-journal.org/otherinfo/Volume-1/546/ 534
2. Jacobs-Blecha, Charlotte, (1993). System Modeling for Apparel Manufacturing; Focus on the Cutting Room. Georgia Institute of Technology G93Nl: 161-164.
3. Karim R, Razzak A, Mahabubuzzaman AKM, and Shahid A. (2019). Comparison of the quality parameter between cotton and melange process, Aust. J. Eng. Innov. Technol., 1(6), 21-30. https://doi.org/10.34104/ajeit.019.21030
4. Kuma, B. Shenthil, (2017). Garment Manu-facturing through Lean Initiative. Inter-national j. on lean thinking, 3(2): 1-12.
5. McClellan, Michael et al. (2000). Lean Manu-facturing; Tools Techniques and How to Use Them. He St. Lucie Press/APICS Series on Resource Management: 1-245.