Abstract
The economy of Bangladesh is growing rapidly with the power of the Ready Made Garments industry which remains the highest exporting sector of the nation from the very beginning. With time being RMG sector has been facing many challenges and increasing production costs is always a bigger concern. Bangladesh is facing a higher production cost of manufacturing any garment compare to its previous ten years while the offering cost from the buyer remains approximately the same. Considering the challenges this sector is more focused on reducing production costs to maximize the profit margin. This paper aims to demonstrate comparative changes in terms of Cycle time, Standard Minute Value (SMV), Capacity, Hourly target, Manpower, and salary by implementing the Kaizen process on a basic shorts manufacturing process. Improving and implementing kaizen, work-study, and motion study in three separate processes of shorts result in a huge saving for the industry. Comparison of data is done by evaluating the process breakdown of the products considering before and after kaizen implementation. This comparison considers basic shorts manufacturing in a floor results in 4 minutes, 10 operators, and $11,520 yearly savings also ensures the increase in capacity, efficiency, and hourly target. So this paper can lead to a better output showing the guidelines for the manufacturers and also the expertise as well.
Publisher
Universe Publishing Group - UniversePG
Subject
Industrial and Manufacturing Engineering,Surfaces, Coatings and Films
Reference10 articles.
1. Abdolshah, M., & Jahan, A. (2006). How to use continuous improvement tools in different life periods of organization. In 2006 IEEE International Conference on Management of Innovation and Technology, 2, IEEE. pp. 772-777. https://doi.org/10.1109/ICMIT.2006.262325
2. Alam, F. B., & Hasan, M. M. (2018). Analysis on SMV to increase productivity in sewing section: a case study on T-shirt manufacturing in Bangladesh. Inter J. of Research in Engineering and Science (IJRES), 6(08), 18-24.
3. https://www.ijres.org/papers/Volume%206/Vol-Issue8/Version-1/C0608011824.pdf
4. Hosen F, Karim R, Islam R, Babu JH, Islam N, Hasan R, and Matin SMA. (2020). Monitoring of the time and action calendar of a T-shirt manufacturing, Aust. J. Eng. Innov. Technol., 2(6), 101-105. https://doi.org/10.34104/ajeit.020.01010105
5. Mohibullah, A. T. M., Takebira, U. M., Mahir, S. Q., Sultana, A., Rana, M., & Hossain, A. K. M. S. (2019). High-tech machine in RMG Industry: reducing SMV, lead time, and boosting up the productivity. J. of Textile Engineering & Fashion Technology, 5(1), 29-34.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献