Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology

Author:

Wang Li-Yan1ORCID,Liu Mengqi2ORCID,Wang Ji-Bo1ORCID,Lu Yuan-Yuan3ORCID,Liu Wei-Wei4ORCID

Affiliation:

1. School of Science, Shenyang Aerospace University, Shenyang 110136, China

2. Business School, Hunan University, Changsha 410082, Hunan, China

3. College of Mathematics, Jilin Normal University, Siping, Jilin, China

4. Department of Science, Shenyang Sport University, Shenyang 110102, China

Abstract

In this paper, the single-machine scheduling problem is studied by simultaneously considering due-date assignment and group technology (GT). The objective is to determine the optimal sequence of groups and jobs within groups and optimal due-date assignment to minimize the weighted sum of the absolute value in lateness and due-date assignment cost, where the weights are position dependent. For the common (CON) due-date assignment, slack (SLK) due-date assignment, and different (DIF) due-date assignment, an O n    log    n time algorithm is proposed, respectively, to solve the problem, where n is the number of jobs.

Funder

National Natural Science Foundation of China

Publisher

Hindawi Limited

Subject

Multidisciplinary,General Computer Science

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3