Affiliation:
1. Business School, Northwest Normal University, Lanzhou 730070, China
Abstract
This article considers a single-machine group scheduling problem with due-window assignment, where the jobs are classified into groups and the jobs in the same group must be processed in succession. The goal is to minimize the weighted sum of lateness and due-window assignment cost, where the weights depend on the position in which a job is scheduled (i.e., position-dependent weights). For the common, slack, and different due-window assignment methods, we prove that the problem can be solved polynomially, i.e., in
time, where
is the number of jobs.
Funder
National Natural Science Regional Foundation of China
Subject
General Engineering,General Mathematics
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献