Affiliation:
1. China University of Mining & Technology (Beijing), 100083 Beijing, China
Abstract
Trajectory planning and tracking control algorithm based on a position and orientation deviation model are proposed to achieve path correction for the mining boom road-header working underground. The proposed strategy is assessed to be feasible and potentially practicable by simulations, from which the following statements are summarized. Firstly, trajectory planning is necessary since different trajectories correspond to different scenarios about undesirable excavation space, slipping level, and power consumption. Secondly, using the proposed tracking control algorithm, the road-header is guided back onto the expected path in limited adjusting steps, with smoothly varying rotation speeds of the driving wheels and regularly reducing pose errors. Lastly, it shows that by implying the SVD-unscented Kalman filtering in the tracking control, the adverse impacts of process and measurement noises are appeased obviously. This research provides an advisable modeling and valuable simulation for the road-header to achieve robotic operation underground.
Funder
National Natural Science Foundation of China
Subject
General Engineering,General Mathematics
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献