Affiliation:
1. Department of Civil Engineering, School of Civil Engineering, Chongqing Three Gorges University, Wanzhou 404100, Chongqing, China
Abstract
Risk assessment of debris flow is conducted by multicriteria decisions. Based on the shortcomings of the existing methods in determining the weight of assessment factors, this paper proposes a new approach to conduct a risk assessment of debris flow. This new approach regards the weight of factors as a uniform random variable, whose bounds could be determined by the equal weight method, maximal deviation method, and entropy method. The results of this new approach are obtained by Monte Carlo simulation. According to the risk of 72 debris flows collected in Beichuan, Sichuan, China, this new approach proves convergent. It is suggested that the minimum sample amount of Monte Carlo simulation should be 63095. The result also demonstrates that sorted results with different weights of factors vary a lot, so it is not convincing to sort samples with a specific weight.
Funder
Chongqing Municipal Education Commission
Subject
Civil and Structural Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献