Affiliation:
1. CONACYT-UAQ, Autonomous University of Queretaro, Faculty of Engineering, Centro Universitario, Cerro de las Campanas s/n, 76010, Santiago de Queretaro, Mexico
Abstract
Although the Multihoist Scheduling Problem (MHSP) can be detailed as a job-shop configuration, the MHSP has additional constraints. Such constraints increase the difficulty and complexity of the schedule. Operation conditions in chemical processes are certainly different from other types of processes. Therefore, in order to model the real-world environment on a chemical production process, a simulation model is built and it emulates the feasibility requirements of such a production system. The results of the model, i.e., the makespan and the workload of the most loaded tank, are necessary for providing insights about which schedule on the shop floor should be implemented. A new biobjective optimization method is proposed, and it uses the results mentioned above in order to build new scenarios for the MHSP and to solve the aforementioned conflicting objectives. Various numerical experiments are shown to illustrate the performance of this new experimental technique, i.e., the simulation optimization approach. Based on the results, the proposed scheme tackles the inconvenience of the metaheuristics, i.e., lack of diversity of the solutions and poor ability of exploitation. In addition, the optimization approach is able to identify the best solutions by a distance-based ranking model and the solutions located in the first Pareto-front layer contributes to improve the search process of the aforementioned scheme, against other algorithms used in the comparison.
Subject
Artificial Intelligence,Computer Networks and Communications,Computer Science Applications,Civil and Structural Engineering,Computational Mechanics
Reference67 articles.
1. Improving the productivity of electroplating lines by changing the layout of the tanks;C. Varnier
2. Queue Preparation in the Dynamic Hoist Scheduling Problem
3. A Unified PSO-based method for multi-hoist scheduling in advanced Galvanic plants;D. Ramin;CoDIT,2020
4. A disjunctive graph and shifting bottleneck heuristics for multi hoists scheduling problem
5. Optimization with constraint logic programming: the hoist scheduling problem solved with various solvers;P. Baptiste,1993
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献