Author:
Zhang Q.,Manier H.,Manier M. -A.
Reference13 articles.
1. The shifting bottleneck procedure for job shop scheduling;Adams;Management Science,1988
2. The disjunctive graph machine representation of the job shop scheduling problem;Blazewicz;European journal of operational research,2000
3. Applying stochastic methods to the real time hoist scheduling problem;Bloch,1996
4. Construction à l’ordonnancement dynamique de traitement de surface;Bloch,1999
5. A simp le metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles;Deroussi;International Journal of Production Research,2008
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献