Stability Analysis and Protection Measures of Large Section Tunnel in Coal Rich Weak Rock Stratum

Author:

Zhou Guannan1,Zhao Zijiang1ORCID,Song Zhanping2ORCID,Wang Hongjian34

Affiliation:

1. China Railway Bridge Engineering Bureau Group Co., Ltd., 300300 Tianjin, China

2. Xi’an University of Architecture and Technology, Xi’an, 710055 Shanxi, China

3. North China University of Water Resources and Electric Power, Zhengzhou, 450045 Henan, China

4. Zhongyuan Oilfield Branch of Sinopec, Puyang, 457000 Henan, China

Abstract

Due to poor engineering geological conditions of Liujiazhuang tunnel on Shanghai-Kunming Passenger Dedicated Line, the large deformation of weak rock occurs repeatedly during tunnel construction. In this paper, the large-scale finite element software ABAQUS is used to simulate the construction process of a large-section tunnel in weak surrounding rock. It is found that when tunnel face passes through the coal seam, the displacement and stress simulated by the bench method increase abruptly. The maximum stress reaches up to 18 MPa, and displacement reaches 45 mm, which is about twice when without crossing coal seam. It is technically feasible to use the bench method for tunnel construction, under the condition when large settlements is allowed; additionally, the bench method has better technical and economic benefits than that of the CD method. Through the comparative analysis of onsite monitoring data and numerical simulation results, it can be seen that the tunnel is in a dangerous state when passing through the coal seam and measures such as strengthening support or auxiliary advance support should be taken immediately to control the surrounding rock and to ensure tunnel construction safety.

Funder

Young Talent Support Project of Henan Province

Publisher

Hindawi Limited

Subject

General Earth and Planetary Sciences

Reference26 articles.

1. Innovative constant resistance large deformation bolt for rock support in high stressed rock mass

2. The status problems and countermeasures of typical disaster prevention and control methods during the construction period of Chinese railway tunnels;S. Tian;Hazard Control in Tunnelling and Underground Engineering,2019

3. Analysis of geological problems of railway tunnels: case study of typical tunnels;Z. He;Tunnel Construction,2016

4. Rapid uncovering seam technologies for large cross-section gas tunnel excavated through coal seams using directional hydraulic fracturing;D. Li;Rock and Solid Mechanics,2019

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3