Effective Evolutionary Algorithm for Solving the Real-Resource-Constrained Scheduling Problem

Author:

Dang Quoc Huu1ORCID,Nguyen The Loc2ORCID,Nguyen Doan Cuong3ORCID,Xiong Naixue4ORCID

Affiliation:

1. Thuong Mai University, Hanoi, Vietnam

2. Hanoi National University of Education, Hanoi, Vietnam

3. Military Institute of Science and Technology, Hanoi, Vietnam

4. Northeastern State University, Tahlequah, OK, USA

Abstract

This paper defines and introduces the formulation of the Real-RCPSP (Real-Resource-Constrained Project Scheduling Problem), a new variant of the MS-RCPSP (Multiskill Resource-Constrained Project Scheduling Problem). Real-RCPSP is an optimization problem that has been attracting widespread interest from the research community in recent years. Real-RCPSP has become a critical issue in many fields such as resource allocation to perform tasks in Edge Computing or arranging robots at industrial production lines at factories and IoT systems. Compared to the MS-RCPSP, the Real-RCPSP is supplemented with assumptions about the execution time of the task, so it is more realistic. The previous algorithms for solving the MS-RCPSP have only been verified on simulation data, so their results are not completely convincing. In addition, those algorithms are designed only to solve the MS-RCPSP, so they are not completely suitable for solving the new Real-RCPSP. Inspired by the Cuckoo Search approach, this literature proposes an evolutionary algorithm that uses the function Reallocate for fast convergence to the global extremum. In order to verify the proposed algorithm, the experiments were conducted on two datasets: (i) the iMOPSE simulation dataset that previous studies had used and (ii) the actual TNG dataset collected from the textile company TNG. Experimental results on the iMOPSE simulation dataset show that the proposed algorithm achieves better solution quality than the existing algorithms, while the experimental results on the TNG dataset have proved that the proposed algorithm decreases the execution time of current production lines at the TNG company.

Publisher

Hindawi Limited

Subject

Strategy and Management,Computer Science Applications,Mechanical Engineering,Economics and Econometrics,Automotive Engineering

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3