Publisher
Springer International Publishing
Reference13 articles.
1. Christian, A., Demassey, S., Néron, E.: Resource Constrained Project Scheduling: Models, Algorithms, Extensions and Applications. ISBN 978–1–84821–034–9 (2008)
2. Klein, R.: Scheduling of Resource-Constrained Projects. Springer Science & Business Media, vol. 10 (2012)
3. Quoc, H.D., The, L.N., Doan, C.N., Xiong, N.: Effective evolutionary algorithm for solving the real-resource-constrained scheduling problem. J. Adv. Transp. 2020, 11 (2020). Article ID 8897710
4. Barghi, B., Sikari, S.S.: Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem. Oper. Res. Forum 3(1) (2022). Springer International Publishing. https://doi.org/10.1007/s43069-021-00117-5
5. De Melo, L.V., de Queiroz, T.A.: Integer linear programming formulations for the RCPSP considering multi-skill, multi-mode, and minimum and maximum time lags. IEEE Latin America Trans. 19(1), 5–16 (2021)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献