Abstract

In deregulated electricity markets, generation companies (GENCO) try to maximize their economic benefits considering the electricity demand, transmission network condition, and other participants’ behaviors. The increasing penetration of renewable sources such as wind power generation with intermittent nature poses several challenges to the participation of GENCOs in the electricity market. Thus, this paper presents a stochastic bilevel optimization model to determine the coordinated bidding strategy of a wind-thermal GENCO with the aim of maximizing its profit in the day-ahead and real-time balancing market. Herein, the model aims to maximize the profit of GENCO in the day-ahead and the balancing market in the upper-level problem while minimizing the operation cost of the system in the lower-level problem. The uncertainties of wind power generation and electricity demand are modeled by defining a set of scenarios considering their mutual correlation using the copula technique. Additionally, incorporating AC power flow constraints in the proposed optimization model offers a better solution to the coordinated bidding strategy of the wind-thermal GENCO. Further, the nonlinear AC power flow equations are linearized using the piecewise approximation technique to reduce the computational complexity and enhance the accuracy of the optimal solution. In the end, the developed algorithm is implemented on the IEEE 24-bus RTS, and the simulation results are provided to validate the efficiency and applicability of the proposed coordinated bidding strategy model. The results advocate that the participation of the thermal unit along with the wind farm might mitigate the risk of uncertainties, but it causes an intense increase in the locational marginal price of the system. Importantly, the simulation results indicate the computational efficiency of the model by developing an exact AC power flow model without compromising the results. Notably, it has been found that the profit of the wind-thermal GENCO would be increased by 35.2% employing the copula technique to model the mutual correlation of uncertain parameters.

Publisher

Hindawi Limited

Subject

Electrical and Electronic Engineering,Energy Engineering and Power Technology,Modeling and Simulation

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3