Affiliation:
1. Department of Civil and Structural Engineering, Moi University, P.O. Box 3900, Eldoret 30100, Kenya
Abstract
For road pavement maintenance and repairs prioritization, a multiattribute approach that compares fuzzy Analytical Hierarchy Process (AHP) and fuzzy Technique for Order Preference by Ideal Situation (TOPSIS) is evaluated. The pavement distress data was collected through empirical condition surveys and rating by pavement experts. In comparison to the crisp AHP, the fuzzy AHP and fuzzy TOPSIS pairwise comparison techniques are considered to be more suitable for the subjective analysis of the pavement conditions for automated maintenance prioritization. From the case study results, four pavement maintenance objectives were determined as road safety, pavement surface preservation, road operational status and standards, and road aesthetics, with corresponding depreciating significance weights ofW=0.37,0.31,0.22,0.10T. The top three maintenance functions were identified as Thin Hot Mix Asphalt (HMA) overlays, resurfacing and slurry seals, which were a result of pavement cracking, potholes, raveling, and patching, while the bottom three were cape seal, micro surfacing, and fog seal. The two methods gave nearly the same prioritization ranking. In general, the fuzzy AHP approach tended to overestimate the maintenance prioritization ranking as compared to the fuzzy TOPSIS.
Subject
Civil and Structural Engineering
Cited by
53 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献