Affiliation:
1. School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Abstract
The stability of the operation of a tailing dam is affected by reservoir water level, phreatic line, and mechanical parameters of tailings. The values of these factors are not a definite value in different situations. Meanwhile, the existence of the phreatic line makes it a more complex issue to analyze the stability of the tailing dam. Additionally, it is very hard to give a definite limit to the state of tailing dam from security to failure. To consider the uncertainty when calculating the stability of the tailing dams, interval values are used to indicate the physical and mechanical parameters of tailings. An interval nonprobabilistic reliability model of the tailing dam, which can be used when the data is scarce, is developed to evaluate the stability of the tailing dam. The interval nonprobabilistic reliability analysis model of tailing dam is established in two cases, including with and without considering phreatic line conditions. The proposed model was applied to analyze the stability of two tailing dams in China and the calculation results of the interval nonprobabilistic reliability are found to be in agreement with actual situations. Thus, the interval nonprobabilistic reliability is a beneficial complement to the traditional analysis method of random reliability.
Funder
China Postdoctoral Science Foundation
Subject
General Earth and Planetary Sciences
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献