Affiliation:
1. Division of Business Administration & Accounting, Kangwon National University, Chuncheon, Republic of Korea
Abstract
This study considers a two-machine flowshop with a limited waiting time constraint between the two machines and sequence-dependent setup times on the second machine. These characteristics are motivated from semiconductor manufacturing systems. The objective of this scheduling problem is to minimize the total tardiness. In this study, a mixed-integer linear programming formulation was provided to define the problem mathematically and used to find optimal solutions using a mathematical programming solver, CPLEX. As CPLEX required a significantly long computation time because this problem is known to be NP-complete, a genetic algorithm was proposed to solve the problem within a short computation time. Computational experiments were performed to evaluate the performance of the proposed algorithm and the suggested GA outperformed the other heuristics considered in the study.
Funder
Ministry of Science, ICT and Future Planning
Subject
General Engineering,General Mathematics
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献