A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction

Author:

Niu Zelin123,Cheng Yun12ORCID,Zhang Yuwei12ORCID,Song Zhanping12ORCID,Yang Guiyang1,Li Hui1

Affiliation:

1. School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an 710055, China

2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi’an 710055, China

3. Fifth Engineering Bureau Co., Ltd., China Railway Bridge Engineering Bureau Group Co., Ltd., Chengdu 610000, China

Abstract

Pipe jacking technology has the advantages of fast construction speed, high economic benefit, and small impact on the urban environment, and mechanical vibration and mechanical soil interaction will lead to the settlement of upper part of pipe jacking and surrounding soil. So, the solution of soil settlement problem is of great significance for underground engineering construction. The soil loss, additional stress, and friction during the construction of rectangular pipe jacking are the main factors that cause the surface settlement. Aiming at the problem of surface settlement caused by pipe jacking in no. 6 subway in Kunming, the formation deformation caused by additional stress and friction force on excavation surface during pipe jacking process was analyzed by Mindlin’s displacement solution, and the formation deformation caused by soil loss was analyzed by random medium theory. Considering the independence of the three influencing factors, the superposition of the three types of stratum deformation was the superposition model of surface settlement, and the model was compared with the empirical method and the measured settlement data to verify its practicability and reliability. The results showed that the surface vertical settlement curve was roughly in the shape of “S,” which can be divided into uplift occurrence area, sensitive settlement area, stable settlement area, and rebound settlement area. Friction force and additional stress caused the uplift of stratum in the front of construction area, and soil loss caused the subsidence of stratum in the rear of construction area. Rectangular pipe jacking in weak stratum caused the soil to move towards the excavation surface, easily causing micro-overexcavation.

Funder

National Natural Science Foundation of China

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3