Affiliation:
1. Department of Road and Bridge Engineering, School of Transportation and Logistics Engineering, Wuhan University of Technology, Wuhan 430063, China
Abstract
The suspenders on the sides of an arch bridge are highly vulnerable to damage caused by traffic load and environmental corrosion. To accurately estimate the cable force of suspenders, herein, we analyse the influencing factors through a suspender tension test based on the principle of suspender vibration. The frequency of each suspender of the bridge is evaluated using the frequency method. By combining the cable force data measured directly and the measured suspender frequency, the formulas for calculating the cable forces of long and short suspenders are fitted, and a reasonable estimation method for the calculated length of short suspenders is provided. The formulas are verified through application to a CFST arch bridge. Results indicate that the proposed formula effectively considers the influence of the sleeve on the overall calculated length of the suspender. The formula calculates the suspender cable force with higher accuracy, proving its suitability for engineering use.
Funder
National Natural Science Foundation of China
Subject
Civil and Structural Engineering
Reference22 articles.
1. A highly precise frequency-based method for estimating the tension of an inclined cable with unknown boundary conditions
2. Analysis on frequency and force of stay cable considering flexural rigidity;W. Zhang;Journal of Highway and Transportation Research and Development,2012
3. Research on replacement process of suspenders of tied arch bridge;F. Li;Journal of Highway and Transportation Research and Development,2006
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献