Author:
Arellano Ulises,Wang Jin An,Balcázar Luz M.,Chen Lifang,Salmones José,Solís Silvia,Asomoza Maximiliano,González Julio
Abstract
Hybrid Ag/CeO2/SBA-15 mesoporous nanocatalysts were prepared and their bactericidal activity was evaluated aiming at elimination of Escherichia coli (E. coli) in the potable water system. It was found that there existed electrons transferring from Ag0 to CeO2 to form Ag+/Ag0 and Ce4+/Ce3+ couples in the heterojunction structure, which resulted from strong interaction between Ag nanoparticles (AgNPs) and highly dispersed CeO2. By increasing the Ag content from 1wt% to 3 and 5 wt% in the catalysts, the bactericidal power of Ag/CeO2/SBA-15 materials significantly enhanced in the presence of both visible and UV light, which can be explained by the increasing electrons transferring function from Ag0 to CeO2 under UV-visible light irradiation. A combination mechanism of E. coli deactivation was proposed where E. coli body may be simultaneously attacked by both AgNPs and Ag+ ions promoted by CeO2. The former may attack the cell membrane, leading to its cleavage and disruption; and the latter may be ionized and released from AgNPs to enter inside the cell, modifying its permeability and respiration, finally resulting in complete deactivation and death.
Publisher
Universidad Nacional Autonoma de Mexico
Reference33 articles.
1. Ahranjani, L.Z., Matin, R.K. (2018). Technical measure of capacity utilization in two-stage production systems: A data envelopment analysis approach. Economic Computation and Economic Cybernetics Studies and Research, 52 (2), 235-249.
2. Aragone , L. S., & Gonzalez, R. L. V. (1997). Fast computational procedure for solving multi-item single-machine lot scheduling optimization problems. Journal of optimization theory and applications, 93 (3), 491-515 https://doi.org/10.1023/A:1022682711077
3. Balkhi, Z. T., & Foul, A. (2009). A multi-item production lot size inventory model with cycle dependent parameters. International Journal of Mathematical Models and Methods in Applied Sciences, 3 (2), 94-104.
4. Cavusoglu, H., Cavusoglu, H., Raghunathan, S. (2012). Value of and interaction between production postponement and information sharing strategies for supply chain firms. Production and Operations Management, 21 (3), 470-488. https://doi.org/10.1111/j.1937-5956.2011.01286.x
5. Chiu, Y. P., Kuo, J. S., Chiu, S. W., & Hsieh, Y. T. (2016). Effect of delayed differentiation on a multiproduct vendor-buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11 (4), 333-344. https://doi.org/10.14743/apem2016.4.231