Affiliation:
1. Interuniversity Department of Regional & Urban Studies and Planning University of Torino Torino Italy
2. Department of Law, Economics, Politics and Modern Languages Libera Università degli Studi Maria Ss. Assunta di Roma Rome Italy
3. Department of Political and Social Sciences University of Bologna Bologna Italy
Abstract
AbstractThe onset of the European NGEU program represented for European member states a formidable opportunity for post‐pandemic recovery and yet a significant challenge at the same time: to receive and retain EU funds, each state had to promptly draw up a National Recovery and Resilience Plan—NRRP) and commit to a pressing timetable for its implementation. Regarding this challenge, the Italian government's response is a case in point: first, Italy is by far the largest beneficiary of NGEU funds; second, it has long had a reputation for being laggard in both the implementation of European directives and the spending of cohesion policy structural funds; and the formulation of the NRRP, the design of the governance in charge of its implementation, and implementation itself, occurred at a particular moment in the country's political life. Based on these premises, the article examines the upstream process by which the Italian government designed the implementation arrangements for the adoption of simplification policies under the NRRP and their downstream recalibration in the first two years, taking the implementation arrangements as the dependent variable. Analytically, the focus is on the interplay between the pressures of EU timetables and internal political dynamics, be they the legacy or strategic political considerations on the part of national policymakers, in determining the design and eventual re‐design of implementation arrangements as the plan unfolds.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献