1. (1) K. Kurita, Y. Wakabayashi, H. Yamada, and M. Horiuchi: “Noise Measurement of Shinkansen High-Speed Test Train”, JSME 17th Environment Engineering Symposium, No7-12, pp. 54-57 (2007) (in Japanese)
2. (2) M. Ikeda: “European criteria for current collection performance on electric railways and current state of Japanese pantograph-catenary systems”, IEE Japan, TER-09-22, pp. 35-38 (2009) (in Japanese)
3. (3) K. Manabe: “Improvement of Shinkansen's Overhead Catenary for High-Speed Operation”, RTRI Report, Vol. 4, No. 12, pp. 1-8 (1990) (in Japanese)
4. (4) H. Aboshi and K. Manabe: “Contact Force Fluctuation between Catenary and Pantograph”, RTRI Report, Vol. 13, No. 7, pp. 7-12 (1999) (in Japanese)
5. (5) Y. Fujii, M. Shimizu, and K. Manabe: “Study on Speedup Technologies for Current Collection System of Shinkansen”, RTRI Report, Vol. 9, No. 1, pp. 43-48 (1995) (in Japanese)