Change in pile capacity with time: case histories

Author:

Samson Laval,Authier Jean

Abstract

Four case histories where important changes in pile capacity were observed with time are presented. Two show an increase of pile capacity for shaft bearing piles driven into deep sand deposits. The increase occurred over a period longer than needed for pore pressure dissipation. In one case, increases of 33 and 85% in pile capacity were measured 2 and 51 days, respectively, after pile driving. The other two case histories deal with the decrease of pile capacity of close-toe pipe piles driven to shale bedrock. The decrease, determined using dynamic monitoring during initial driving and at restriking a few days later, ranged from 11 to 25%. It is concluded that restriking should be currently practiced on all construction sites to investigate any change in pile capacity after driving. This procedure is particularly recommended for toe bearing piles on shale bedrock. Key words: pile capacity, shaft bearing piles, toe bearing piles, relaxation, soil setup, pile dynamic analysis, shale, time factor, case histories.

Publisher

Canadian Science Publishing

Subject

Civil and Structural Engineering,Geotechnical Engineering and Engineering Geology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3