Author:
Ervin Maxwell C,Benson Neil D,Morgan Jack R,Pavlovic Nick
Abstract
The Southbank Interchange of the Melbourne City Link Project links major freeways and access roads. The permanent excavation covers an area of 3 ha and extends to a maximum depth of 9 m, which is 6 m below the ground water table. Design and construction approaches were developed to (i) control seepage into the excavation to limit groundwater lowering beyond the site, and (ii) limit the effects of potentially damaging base heave during construction. Lateral flow of groundwater into the excavation was controlled by a cut-off wall extending through the compressible clay with a surrounding line of closely spaced recharge wells. Analyses showed the recharge wells in combination with the wall would be effective in limiting drawdown outside the site. Monitoring showed that pore water pressures were maintained within the design criteria, with the assistance of deep recharge of an underlying aquifer to control vertical seepage. Survey showed settlements outside the site were minimal. Shallow pressure relief drains were installed to limit uplift pressures and control base instability in the deepest parts of the excavation. Monitoring of the groundwater levels in the underlying aquifer and comparisons with results from flow models were used to successfully control uplift pressures during construction.Key words: clay, settlement, groundwater, excavation, recharge, construction.
Publisher
Canadian Science Publishing
Subject
Civil and Structural Engineering,Geotechnical Engineering and Engineering Geology
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献