The Challenges to Retrieve a Stuck Coiled-Tubing Pipe Without Downhole Check Valves in a High-Pressure Well: A Case Study from Argentina

Author:

Vechietti Matias1,Di Benedetto Belen1,Krasuk Raul Miguel1,Mirande Juan Martin2,Franco Delgado Ernesto2,Trujillo Santiago2,Palombizio Giovanni2,Jahn Felix2,Carreno Nestor2

Affiliation:

1. Vista Oil & Gas

2. Schlumberger

Abstract

Abstract (300 words) This paper describes the lessons learned during the completion phase of an unconventional well in Argentina. Where a coiled tubing was used to perform a plug drill out campaign. The article describes the procedure of how the CT service provider followed to release a stuck pipe, the well barrier regains and its recovery. The potential solutions were analyzed by the engineering teams from both CT service provider at local and headquarter levels and the local vendors. The fact of cutting the pipe after getting stuck and unsuccessful retrieval attempts result on losing the well control barriers inside the CT pipe. There was a need to regain the well control before proceeding with the retrieval process. The use of a mechanical agents to plug the pipe was assessed, it was considered internal mechanical plugs that due to logistics will result in excessive times. Therefore, the team looked into the chemical solutions, and cement plug was also visualized but discarded due to tendency of laying down in the horizontal section of the wellbore; Finally, a high viscous resin that is fast setting time was evaluated as the optimal solution to set a plug inside the CT, which was the key to success on the safe retrieval operation. The Argentinian well was completed with 57 stages isolated by 56 dissolvable plugs over 3000 m of the horizontal section. After removing all the plugs in the horizontal section down to total depth. CT pipe was being retrieved to surface performing the final wiper trip, when it got stuck. After several unsuccessful release attempts. The decision was to cut the CT pipe at surface to allow the wireline to perform the downhole cutting. Wireline (WL) rigged up on top of the injector head and performed a tubing puncher run, 3 m below the cutting depth. Then, WL perform a second run at the free point, at a depth of 3900 m, deploying a chemical cutter to release the CT pipe. Once the CT pipe was confirmed free, the resin service company, proceed to install their high-pressure lines in the top of the injector head and proceed to pump 6.7 bbls of resin at a pump rate of 1.5 bpm, displacing it with 5 bbls of gel and 30 bbls of water leaving the bottom of the plug 500 m above of the new CT end. After the thickening time, a pressure test of the plug was done up to 8000 psi for 30 minutes followed by an inflow test of 6 hours, after the successful completion of both, the retrieval of the CT pipe was followed. This project describes the design and execution process of pumping a resin plug, without previous experience within our organization at global basis, that is suitable to regain well control on CT pipes that lost the downhole safety valves after being cut due to a stuck condition.

Publisher

SPE

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3