Flowback Three-Phase Flowmeter Implementation for Post-Fracturing Cleanouts: A Case Study from Argentina

Author:

Mirande J. M.1,Vassallo J.1,Mambriani P.1,Gonzalez C.1,Fajardo E.1,Vecchietti M.2,Krasuk R.2,Misonischnik A.2

Affiliation:

1. SLB, Neuquén, Argentina

2. Vista Energy, Neuquén, Argentina

Abstract

Abstract Unconventional horizontal wells completed with plug-and-perf fracturing techniques require coiled tubing (CT) to clean out the well before it is put into production. To remove proppant and plug debris, water is pumped into the wellbore and flowed back to the surface through the annular section between the CT and the production casing. This study describes implementation and impact of a three-phase flowmeter to measure the return rate and detect proppant and gas in real time. During CT post-fracturing cleanouts, fluid return rate is critical to monitor because the annular fluid velocity that carries solids out of the well is proportional to it. In addition, wells in Argentina must be kept in a near-balanced condition to avoid producing gas from the well. Fluid return rates used to be measured with an ultrasonic flowmeter, which experienced signal loss when there was more than 5% sand or gas in the fluid, making it unreliable for this workscope. A three-phase flowmeter was therefore implemented to achieve high-frequency and real-time measurements of water, proppant, and gas at the surface. Implementation of the three-phase flowmeter allowed cleanout optimizations without sacrificing operational safety. Having a precise and continuous measurement permitted the variation of the flowback choke strategy, increasing the return rate to a value closer to the pumping rate by 0.1 bbl/min without affecting the well balance condition. During the execution of the first four-well pad after this new flowmeter was implemented, analysis of the sand flow rate measurement showed that the wells were already clean when the CT had to be pulled out of hole (POOH) after reaching total depth, as only traces of sand were detected during this part of the operation. With this information, the job procedure was optimized by increasing the horizontal section POOH speed from 6 m/min to 12 m/min, if sand was not detected at surface. It also prevented pumping gel pills. This represented a 10% reduction in the total operating time per well and a 25% reduction in xanthan gel consumption in the next completed pad. This is the first time that a three-phase flowmeter has been implemented for post-fracturing cleanouts in Argentina Vaca Muerta operations. The increase in the precision of surface measurements means a more controlled cleanout strategy, during which flowback is evaluated in real time and the operational program can be optimized. Poor flowback control is a known contributing factor to stuck pipe incidents. This technology plays a critical role in addressing one of the major risks during CT operations.

Publisher

SPE

Reference10 articles.

1. Deen, T., Daal, J., and Tucker, J. 2015. Maximizing Well Deliverability in the Eagle Ford Shale. Paper presented at the SPE Annual Technical Conference and Exhibition, Houston, Texas, USA, 28–30 September. SPE-174831-MS. https://doi.org/10.2118/174831-MS.

2. Galvan, I. I., Nebiolo, M. M, Del Negro, R. D.. 2017. Vaca Muerta Coiled Tubing Operations Success and the Development of Future Extended Reach Operations. Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, Houston, Texas, USA, 21–22 March. SPE-184752-MS. https://.doi.org/10.2118/184752-MS

3. Garcia, S. J. R., Moll, J. M., Olivas, J. A.. 2013. Accelerating the Learning Curve: Adapting Global Expertise to Coiled-Tubing Operations in Argentina Shale Development. Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, The Woodlands, Texas, USA, 26–27 March. SPE 163929-MS. https://doi.org/10.2118/163929-MS.

4. Mirande, J. M., Palombizio, G., Arevalo, L.. 2022, Novel Coiled Tubing Post-Fracturing Cleanout of Unconventional Wells Without Downhole Motor: A Case Study from Argentina. Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, The Woodlands, Texas, USA, 21–22 March. SPE-212943-MS. https://doi.org/10.2118/212943-MS.

5. Potapenko, D., Theuveny, B., Williams, R.. 2019. State of the Art of Flow Management for Frac Plug Drillout and Flowback. Paper presented at the SPE Annual Technical Conference and Exhibition, Calgary, Alberta, Canada, 30 September–2 October. SPE-196084-MS. https://doi.org/10.2118/196084-MS.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3