Mud Displacement During Cementing State of the Art

Author:

Sauer C.W.1

Affiliation:

1. Conoco Inc.

Abstract

Distinguished Author Series articles are general, descriptiverepresentations that summarize the state of the art in an area of technology bydescribing recent developments for readers who are not specialists in thetopics discussed. Written by individuals recognized as experts in the area, these articles provide key references to more definitive work and presentspecific details only to illustrate the technology. Purpose: to informthe general readership of recent advances in various areas of petroleumengineering. Summary. This paper is a summary of past and present work on the subject ofmud displacement during cementing. Such topics as centralization, pipemovement, pipe-lowering speed, drilling-fluid conditioning, hole geometry, spacer design, flow rate, equivalent circulating density, job monitoring. postjob evaluation. and the application of each to the mud-displacement postjobevaluation. and the application of each to the mud-displacement process arediscussed. This work includes a mud-displacement "checklist" process arediscussed. This work includes a mud-displacement "checklist" for use before andduring cementing. Although most of what is discussed has been presentedpreviously, this discussion will tic all these critical points into onediscussion for use by both operations and engineering points into onediscussion for use by both operations and engineering personnel involved incementing jobs, personnel involved in cementing jobs. Introduction The replacement of drilling fluids with cement to support and to protectcasing, as well as to seal formation pressures hydraulically, has been thedesire of prudent operators for 75 years and is at a point where well-definedmechanics of mud displacement are understood. Personnel and environmentalsafety, the success of an exploration program, the validity of reservoirengineering calculations, and good placement control of stimulation treatmentsdepend on placement control of stimulation treatments depend on well-cementedcasing, yet there are still many instances of poor placement design incementing operations. The cementing of an oil, gas, or injection well can be one of the mostdifficult tasks encountered during the drilling or completion of the well if itis done correctly. Unfortunately, at least one cementing operation is performedon every well drilled, so the cementing is often thought of as routine and maynot get the proper attention. Because it is seldom required to prove thequality of the cement job, and even when it is, evaluation tools and methodscan be less than perfect, many cement placement mistakes are never discovered. if enough subsequent production tests show communication with zones other thanthose desired, it may be believed that a good cement job is impossible toobtain. But a good cement job is possible. It takes a considerable effort by allconcerned: the drilling foreman, drilling engineer, drilling contractor, andvarious service companies involved. The planning must take place days, weeks, or sometimes months before drilling. To replace the mud used to drill the hole, to cement, and to form a hydraulic seal properly, efforts will have to be takenduring drilling, properly, efforts will have to be taken during drilling, logging, casing running, precirculation, cement mixing, displacement, plugbumping and waiting-oncement time. It should not be believed that the cement job will be easy. regardless ofwhat else is taking or has taken place during drilling to the casing point. Hole place during drilling to the casing point. Hole geometry, mud viscosity, pipe running speed, centering of the casing, mud type, mud/cementcompatibility, displacement flow regimes, and many more aspects of the totaloperation must be considered. No single additive, technique, or magic will makecementing a success. A complete engineering analysis of all the parameters inthe cementing equation must be undertaken to guarantee success. With this in mind, this report will investigate the state of the art of muddisplacement during cementing. Although oil-based muds are used on a regularbasis in some areas of the world, the greatest amount of work reported on muddisplacement has been with water-based muds. Still, it is believed that most ofthe basics apply regardless of the type of mud in the hole. P. 1091

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 32 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3