Water Shutoff Challenges Experience and Lessons Learned in Horizontal Passive Inflow Control Devices Completions of Giant North Kuwait Darcy Reservoir

Author:

Abdel-Basset Mohammed1,Zakaria Shams El-Dine2,Al-Husaini Mohammed2,Barki Jassim2,Chong Mizan2

Affiliation:

1. Schlumberger

2. Kuwait Oil Company

Abstract

Abstract Water conformance is a common challenge in oilfield industry especially in water flood and active water drive reservoirs where water production has a significant impact on production economics, oil recovery and facilities constraints. Water shut-off (WSO) is an essential solution to delay or minimize water production however effectiveness depends on treatment efficiency. This abstract will demonstrate extensive mechanical and chemical WSO experience in horizontal drilled wells completed with passive Inflow Control Devices (ICD) completions, with case histories from North Kuwait giant water aquifer reservoir. The main challenge during water conformance treatment is the proper diagnosis and the full understanding of the water flow profile; accurately identify the water source as well as reservoir understanding will help selecting the efficient WSO mechanism, which is crucial for a sound decision making considering the associated cost and the operational complications. Understanding reservoir geology, Integration of inflow profiling via Horizontal PLT and new technologies of water saturation logsare key to accurately identify the water source (heal, middle or toe side) and by turn WSO mechanism. This is done in integration of multidisciplinary domains of G&G, production and reservoir engineers and operation teams. Mechanical WSO using inflatable packers’ technologies were applied for isolating the toe side, while chemical WSO technologies used for heal side isolation in the open-hole passive ICD completions. Rig-less shifting of ICD sleeves used where active SSD-ICD's completion installed. The statistics of executed WSO results of many case histories have shown relatively good success ratio represented in reducing water cut from 80 – 90% down to 20 – 70%, increase oil production rate from 200 bopd up to 3000 bopd in some wells depending on water source. Furthermore, WSO enabled bringing some inactive high-water wells back to production. This helps extending well-life and by turn maximizes ultimate hydrocarbon recovery. Also, reducing the total water production to facility allowed increasing production of some other wells producing to same facilities. As key learnt lesson; managing the produced liquid rate and drawdown post WSO is essential to maximize the benefit of WSO and delay sharp increase of water cut. WSO solutions are in constant improvement. Integrating reservoir characterization, fluid inflow profiling and proper selection of WSO technique is crucial for any successful WSO decision. WSO became a common practice to maximize the oil recovery factor from Lower Burgan reservoir of North Kuwait fields.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. SUVURMA SİSTEMLƏRİNİN TƏHLİLİ ƏSASINDA NEFT LAYINA SUYUN VURULMASININ SƏMƏRƏLİLİYİNİN ARTIRILMASI;PAHTEI-Procedings of Azerbaijan High Technical Educational Institutions;2024-03-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3