A Method for Determination of Average Pressure in a Bounded Reservoir

Author:

Matthews C.S.1,Brons F.2,Hazebroek P.3

Affiliation:

1. Shell Development Co.

2. Shell Oil Co.

3. B.P.M.

Abstract

Published in Petroleum Transactions, AIME, Volume 201, 1954, pages 182–191. Abstract A method has been developed for calculating the average pressure in a bounded reservoir. The reservoir is first divided into the individual drainage volumes of each well, by using the criterion that at steady state each individual drainage volume is proportional to a well's production rate. The average pressure in each drainage volume is then calculated by a method developed in the report. By volumetrically averaging these individual drainage volume pressures, the average pressure in the entire reservoir is obtained. To calculate the average pressure in each drainage volume, a correction is applied to the ordinary extrapolated pressure, i.e., the pressure obtained by extrapolating to infinite time the linear portion of the graph of closed-in pressure versus log [?t/(t + ?t)], where ?t is the closed-in time and t the production time. The correction, which is a function of the production time, is presented in graphical form for different shapes of the drainage area (horizontal cross section of the drainage volume). Introduction It is important to be able to find the volumetric average pressure in a reservoir so that the size of the reservoir may be determined from material balance calculations. It is also desirable to be able to find the approximate distribution of pressure within a reservoir for detection of fluid movement. The purpose of this paper is to present a method for calculating both the average reservoir pressure and the approximate distribution of pressure within a bounded reservoir that is, a reservoir with no water drive. In reservoirs where the pressure builds up rapidly after wells are shut in, the determination of average pressure generally poses little problem, for one often need only average the final buildup pressures. It is when pressure buildup is slow that difficulties arise. For practical and economical reasons, the time allowable for closing in wells is limited. If at the maximum allowable closed-in time the pressure has not reached a constant value (and this is more often the case than is generally realized), calculation of average pressure presents difficulties.

Publisher

Society of Petroleum Engineers (SPE)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3