Abstract One of the key challenges for Oil and Gas industry in current (low price) scenario, is efficient handling of mature Assets. This is because of the fact that reasonable amount of hydrocarbons still exist in such reservoirs but in scattered and partially-drained locations. Moreover, lower production rates, combined with ever-increasing costs, hardly satisfies the economic screening criteria for their expansion with new wells. This study presents an approach used on such a Mature Gas Giant in Pakistan, in order to re-vitalize old wells and exploit the scattered sweet spots (still prevailing in reservoir), with the help of a robust engineering and geological strategy. The field under study was discovered in 1950s, in the eastern onshore area of Pakistan. The primary reservoir, under study, is a depletion drive fractured limestone i.e. no pressure support was observed in P/Z data. At present, more than 92% of the EUR has already been produced from this reservoir, which translates to 82% of Field In-Place volume. However, the performances of multiple wells have gone down with time, due to the depletion in Reservoir Pressure and the channeling of water towards producing wells-through the faulted/fractured zone. To cut water production and arrest the Annual field decline of 7-8 %, various activities have been carried out, including cementing, tubing size reductions, chemicals; but all the efforts went in vain. In this paper, a detailed approach is presented, that was taken to tap the undrained areas in the vicinity of the existing producers - suffering from water hold ups and low gas rate problems. The Production logs were used first to identify the water production zone. Afterwards, a comprehensive algorithm was developed to analyze the Geological and Geophysical parameters and identify the undrained prospects while keeping minimal capital exposure. So far, a gain of around 10 MMScfd have been observed with the help of two engineered Sidetracks - which has added around 10 - 15 BCF reserves in our portfolio. The most common issues encountered in a mature asset are liquid loading and water breakthrough. This study illustrates the methodology to resolve such issues with minimum investment towards the end of field life. It focuses on the benefits of sidetracks as a production enhancement tool, to reduce the annual decline. This paper offers an innovative approach, to utilize each geological and engineering data set in a systematic manner, in order to re-work old wells at optimum locations to evade issues affiliated with gas entrapment and water production. In the end, the paper also describes the evaluation process of production gains, geology, well construction, and completion types, that can be adapted to reap maximum rewards in such mature fields.

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3