Bridging the Gap: Challenges in Deploying Leading Edge Geomechanics Technology to Reducing Well Construction Costs

Author:

Mody Fersheed K.1

Affiliation:

1. Shell Intl. E&P Inc.

Abstract

Background Over the past two decades Geomechanics has made substantial contributions to the petroleum industry in the following areas:○reducing well construction costs1,○maximizing production2, and○increasing the life of the well. Currently the industry is venturing into more complex extended reach wells3, deeper water, higher pressure higher temperature environments, sub-salt settings4, lower pore pressure/fracture gradient margins, depleted zones5, fractured carbonates2 and fractured reservoirs6, environmentally sensitive areas, and many other difficult to develop situations, as illustrated in Figure 1. Geomechanics will play a significant role in addressing these added challenges. The high price of oil is here for a long time. Our technical responsibility is to make sure that the unit development cost (UDC) to produce this oil is contained and subsequently lowered with aggressive application of relevant technology and a knowledgable workforce adept at applying this technology. Being prepared to deal with the following issues will be integral to success:○borehole (in)stability7–12,○lost circulation13,14,○stuck pipe15,○sand production16,17,○casing collapse18,19,○well failures20,○formation damage21,○sub-salt related issues2. Each of these problems can strike at any time if we are not vigilant and pro active in avoiding them. Prevention at the outset is more cost-effective than fixing these issues later. I propose we have to bridge the gap between people and technology to be effective in this age of oil industry geomechanics. See Figure 2. Controlling Costs Geomechanics-related issues cost the industry billions of dollars.22 We cannot afford, as an industry, to lose billions of dollars on Geomechanics-related non-productive time (NPT) and associated loss in revenues.32 Over the past decade, for the drilling industry on an average twenty two percent of the drilling budget can be attributed to wellbore related NPT. Fifty percent of this NPT is associated with geomechanics related (i.e. wellbore stability, Lost circulation, stuck pipe, etc.) issues.1, 8, 11, 22, 32 In spite of advances in technology, this NPT percentage associated with borehole related problems has not drastically changed over the past decade. NPT percentage of the total drilling budget is much too high and must be lowered to a more acceptable level. Also further scrutiny of the NPT data suggests a trend, that approximately 90% of costs can be attributed to a small percentage of wells that are highly complex. When these wells have problems, the cost escalates. See Figure 3. Hence, it is critical to manage the available geomechanics resources in the most optimal manner. It is important to identify the high mechanical-risk index wells and get the right geomechanics resources committed - both personnel and data collection - early in the planning stages of the well construction and utilize these resources throughout the well delivery cycle.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3