First Implementation of Managed Pressure Drilling (MPD) System in Swamp Barge Rig to Drill Narrow Pressure Window HPHT Exploration Well Safely – Return of Experience from Kalimantan, Indonesia

Author:

Setiohadi _1,Hadistira Praja1,Yudhatama Muhammad Alfianoor1,Sitompul Daniel1,Hutabarat Dikha Escodianto1,Wiharja Andre1,Agriawan Crisa1,Martadinata Aji2,Sudiariaji _2,Sidianto Agus2,Prasthio Andry3,Irawan Fikri3

Affiliation:

1. Pertamina Hulu Mahakam

2. Apexindo Pratama Duta

3. Weatherford Indonesia

Abstract

Abstract The first ever HPHT exploration well in Kalimantan was drilled by Swamp Barge Rig with narrow pressure window environment. The well was planned to be drilled using 2.9 SG mud weight to 4575 m vertical depth with 0.10 SG pressure window. Maximum predicted bottom hole temperature of the well was 186° C while the maximum expected wellhead pressure (MEWHP) reached 11,300 Psi. MPD becomes mandatory to complete the well and becomes a novel implement for swamp barge rig operation. Therefore, MPD workshop was held among the teams to ensure all personnel become familiar with the system. On other hand, the equipment configuration was set with some modifications to accommodate the operation requirement, contingency, tight stack up below rotary table and hoisting devices limitation. Rotating Control Device (RCD) was stacked up part by part on tight moon pool space. Several modifications were done properly and gave operation flexibility plus robust contingency. RCD alignment was reset periodically and natural rubbers were utilized to enhanced rubbers lifetime in high temperature condition. EKD system with Coriolis utilization was being main mitigation during drilling with limited kick margin that will allow reservoir section to be accessed. Formation pressure investigation was also performed to give additional information on formation pressure for better well assessment. SBP application on dual gradient tripping and managed pressure cementing give a means to secure the well safely and properly during high gas event with losses condition. As the result, MPD implementation enables the operator to complete HPHT exploration well on swamp barge rig project safely despite the complexity and risk of narrow formation pressure window operation.

Publisher

SPE

Reference5 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3