Multilateral TAML Level 4 Junction Provides Maximum Flexibility for Drilling and Intelligent Completions

Author:

Samie Mohamed1,Siham Ahmed1,Gavin Bruce1

Affiliation:

1. Halliburton

Abstract

Abstract A multilateral (MLT) well with an advanced intelligent completion string was recently completed in the Middle East. The well was designed as a "stacked" dual producer in the upper and lower reservoir, and was drilled using the latest geo-steering techniques to accurately place the wellbore in a highly faulted and geologically complex structure. Rotary-steerable drilling systems (RSS) were used in several of the hole sections, along with advanced logging-while-drilling (LWD) tools including multi-pole acoustic, azimuthal deep resistivity, and resistivity at bit. Encounters with unstable shale and faults made the drilling difficult, but the decisions made in real-time to navigate the well resulted in a very high percentage of net pay in both laterals. This well combined TAML Level 4 multilateral (MLT) technology with passive inflow control devices in the laterals and an advanced intelligent completion system in the mainbore. The TAML Level 4 multilateral junction was cemented to isolate unstable shale above the reservoir and to provide zonal isolation from the lateral completions, which were compartmentalized into stages with proprietary swellable packers and inflow control devices (ICDs). The intelligent completion was run in the mainbore with two interval control valves (ICVs) and isolation ball valve (LV ICV) to manage the production from each of the two laterals independently. The ICVs and LV ICV are controlled hydraulically through four control lines to surface, which were run in a flat-pack with one electric line to control a downhole gauge package for each lateral. Finally, the well was configured to allow the installation of a large electric submersible pump (ESP) to be run inside the upper 9-5/8-in. production tubing. This project required intensive planning and coordination for more than a year in advance, which made the project successful despite the difficult drilling conditions and resulted in very little NPT for wellbore construction operations. This paper will focus on the planning, execution and lessons learned from the project.

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3