Abstract Following the rig-based well testing stage, completion programs of high-pressure wells in North Kuwait call for well killing with heavy oil-based mud (OBM). The workover rig is then demobilized, and production flowlines are installed. Well activation plans are carried out riglessly, and coiled tubing (CT) is instrumental to bringing the wells back to sustainable production. One of the major drawbacks from this practice is the formation damage generated by the OBM, which often requires additional interventions for remediation. To address this limitation, a new approach leveraging instrumented CT for temporary well suspension was recently implemented. Real-time downhole telemetry is enabled by an optical line installed in the CT pipe and used to accurately set a through-tubing inflatable packer (TTIP). Once the latter is anchored at the planned depth, above the interval open to the formation, CT is disconnected from the packer assembly, and the fishing neck is protected with a sand plug. CT is then retrieved to surface, and a slickline dump bailer is run to spot cement on top of the sand plug. Once the cement has set, CT is run to displace the wellbore to kill fluid. Two pilot wells were selected to implement this new approach for temporary well suspension. Both wells had a maximum potential wellhead pressure in the order of 7,400 psi, and 15.0-ppg OBM was originally planned for well suspension purposes. Upon completion of the zonal testing program - which included initial stimulation, well activation, and flowback - instrumented CT was run with high-pressure rotary jetting to condition the TTIP setting depth and displace the wellbore with brine, after which, a shut-in wellhead pressure near 2,000 psi was observed. In the next CT run, TTIP was set close to the end of the production tubing, and critical stages, such as depth correlation, packer inflation, and packer anchoring testing were closely controlled via real-time downhole measurements. Additional verification of the TTIP effective seal was carried out before the CT was disconnected from the packer assembly through an inflow test relying on live downhole pressure monitoring. Once the TTIP released, the temporary suspension was completed following the methodology described above. Finally, the wells were observed at surface with zero pressure for more than 24 hours, receiving acceptance from the operator. This alternative approach for temporary well suspension represents an innovative solution to bring wells back into production without additional restimulation or well activation. This methodology greatly relies on CT real-time downhole telemetry, and operators from the Middle East can benefit from the experience gained in this project.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3