Performance Review of a Large-Scale CO2-WAG Enhanced Recovery Project, SACROC Unit Kelly-Snyder Field

Author:

Kane A.V.1

Affiliation:

1. Chevron U.S.A. Inc.

Abstract

Introduction This paper reviews the performance of the CO2-WAG (water-alternating-gas) project conducted at the SACROC (Scurry Area Canyon Reef Operators Committee) Unit since early 1972. Numerous papers published previously describe in great detail the reservoir, previously describe in great detail the reservoir, the CO2 displacement process, the transmission of CO2 to the field, the mechanics of the operation of the project, a progress report through 1975, and other matters. Since detailed descriptions are available of reservoir characteristics, field history before the inception of the CO2 project, planning and design, and facilities installations, these subjects will be reviewed only briefly here. The performance of CO2 project itself since it began in J an. 1972 is emphasized. project itself since it began in J an. 1972 is emphasized. Kelly-Snyder Field, located in Scurry County, TX, is the major unitized field among four continguous fields along the 35- x 5-mile (56.3- x 8.05-km) Canyon Reef formation (Fig. 1). Reservoir and fluid properties are summarized in Table 1.Estimated original oil in place in the SACROC Unit area, based on a volumetric determination, was 2.73 billion STB (434 Mm3). This volume was used for the evaluation and design of the CO2 miscible flood and for early estimates of incremental oil recovery resulting from CO2 processing.In 1973, Chevron Oil Co., SACROC Unit operator conducted a 24-year history match of more than 1,500 wells in Kelly-Snyder Field using a two-dimensional black-oil simulator. On the basis of this study, the estimated original oil in place in the SACROC Unit area was reduced to 2.113 billion STB (335.9 Mm3). History of Kelly-Snyder Field and the SACROC Unit Before the CO2-WAG Project Project The reservoir was discovered in Nov. 1948. Subsequent development was rapid and essentially complete by Nov. 1951 when 1671 producing wells had been drilled. The production and injection history of the field is shown production and injection history of the field is shown in Fig. 2.Early production performance indicated that solution gas drive was the primary producing mechanism and that a pressure maintenance program would be required to prevent excessive loss of reserves. To improve recovery prevent excessive loss of reserves. To improve recovery the operators and royalty owners of Kelly-Snyder Field agreed to unitize to begin pressure maintenance. In 1953, the Texas Railroad Commission approved formation of the SACROC Unit.Water injection into a unique pattern involving 72 center-line injectors began Sept. 1954. Because of increased oil demand and resulting higher allowables, injection capacity had to be added beginning in 1969. During 1969-71, 72 additional wells were converted to injection service, resulting in a total of 144 center-line injectors. Operational of this center-line injection system continues presently. JPT p. 217

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3