3 ½in. Coiled Tubing Telemetry System Saves Time and Improves Operational Efficiency During a Multi-Well Campaign in Norway

Author:

Blanco Diego1,Sach Manfred1,Livescu Silviu1

Affiliation:

1. Baker Hughes

Abstract

Abstract A newly-developed 3 ½-in. coiled tubing telemetry (CTT) system has been used for the real-time operational optimization of such coiled tubing (CT) applications as milling, cleanout, logging, and perforation, in an offshore multi-well campaign in Norway. The CTT system consists of surface hardware and software, a dual-purpose wire inside the carrying CT, and the multi-function bottom hole assembly (BHA). The wire transmits electrical power from surface to the downhole sensors located in the BHA and the downhole data from these sensors to surface. The BHA, designed in one of three sizes (i.e., 2 ⅛-, 2 ⅞-, and 3 ½-in.), contains a casing collar locator (CCL) and two pressure and temperature transducers that are capable to measure downhole data inside and outside the BHA. One of the main advantages of the CTT system is its versatility. For instance, switching between applications is as simple as only changing a certain part of the BHA. This reduces the need to rig-up and rig-down and leads to operational time and cost savings to operators. Another main advantage stems from its real-time downhole data certainty, as the CT field crew can immediately make decisions based on dynamic downhole events. A few papers have been published recently regarding a similar 2 ⅛ and 2 ⅞-in. CTT systems (SPE-174850, IPTC-18294, SPE-179101, and SPE-183026). In this paper, several case studies are presented for the 3 ½-in. CTT system for the first time. For instance, in the first well, the CTT system helped remove approximately 26,500 lb of scale through a complex wiper trip schedule, effectively preparing the well for re-completion by the main rig. In the second well, the CTT system helped pull all shallow and deep plugs and perforate three intervals in one run. In the third well, the CTT system helped clean out the well, set a plug, and re-perforate it. In addition to successfully performing all these operations, several other benefits resulted due to the real-time downhole data monitoring provided by the CTT system. For instance, the fluid friction reducer (used for reducing the fluid frictional pressure drop) was effectively used at volumes of 70-75% lower than those recommended when the CTT system is not used. Also, all these operations were performed without the need to mobilize most of the wireline and tractor equipment and crew, saving an estimated time per well of six days of wireline logistics and work. The paper briefly describes the 3 ½-in. CTT system and discusses the data acquired during these field operations. The system performance and operational benefits confirmed are presented. These findings outline the versatility of the 3 ½-in. CTT system, the predictability of successful operations resulting from using this system, and the cost and time savings to operators.

Publisher

SPE

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3