Tunnel-Length Modeling for Coiled-Tubing-Acid-Tunneling Stimulation in Carbonate Reservoirs

Author:

Livescu Silviu1,Craig Steven1,Aitken Bill1

Affiliation:

1. Baker Hughes

Abstract

Summary A coiled-tubing (CT)-acid-tunneling-stimulation technique has been successfully applied in the preceding 15 years on limestone and dolomite reservoirs around the world (the Middle East, southeast Asia, North America, South America, and Europe). Several case histories were presented in the past showing that this technique might bring significant benefits over other carbonate-stimulation methods in openhole wells. In this paper, the parameters affecting the predicted and achieved tunnel lengths are discussed for the first time. The acid-tunneling technique consists of pumping hydrochloric acid (HCl) through conventional CT and a bottomhole assembly (BHA) with jetting nozzles to create (without drilling) stable drainage holes (tunnels) into the reservoir pay zone. The BHA also includes a special kickoff tool, with two pressure-activated bending joints, that controls the tunnel-creation direction. The acid that is not consumed during the main tunneling process leaks into the reservoir rock, creating wormholes that improve the connectivity between the reservoir and the wellbore and positively influence well production. This acid-tunneling technique can potentially create numerous tunnels with different depths. The optimization of the tunnel-creation-depth selection is made by production-software simulation using such critical information as the well parameters (trajectory and size), available logs (image, resistivity, caliper, drilling), and past reservoir information. The results from many field case histories involving the CT acid-tunneling technique from around the world were presented previously. However, many questions remain unanswered regarding the actual downhole tunnel-initiation/creation process. In this study, a detailed discussion of acid-tunneling modeling is included to answer some of those questions. The parameters affecting the predicted tunnel lengths and the parameters that could be monitored or adjusted to create the tunnels smoothly are discussed. This paper describes the CT acid-tunneling technology and discusses some of the most important questions regarding downhole CT acid-tunneling creation. The acid-tunneling-technique performance and benefits confirmed during field operations are presented.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Energy Engineering and Power Technology,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3