Real-Time Drilling Engineering and Data-Driven Solutions for Upstream Cost Savings: Coupling Earth Models, Digital Twins, Data & Drilling Automation

Author:

Amin Muhammad Rizky1,Baruno Agung1,AitAli Rachid2,De Vreugd Joost2,Forshaw Matthew2,Mahmoud Mohamed Yehia2

Affiliation:

1. ADNOC Onshore

2. Baker Hughes

Abstract

AbstractDespite the market up-cycle efficient use of CAPEX for upstream well construction projects remain a key topic for E&Ps. Therefore, non-productive-time and invisible-lost-time (NPT & ILT) reduction continue to be paramount.Wells of such complexity require the introduction of new drilling automation technology to meet the challenge associated with inadequate hole cleaning, vibrations and connections practices resulting of the implementation of the i-Tral real-time monitoring used to mimic manual torque and drag parameters through artificial intelligence and machine learning allowing extrapolation, alarming and therefore early warning onset of friction and stuck-pipe, continuously supply required flowrate and visualize cuttings concentration along the wellbore and real-time multi parameters optimization for drilling dysfunction and penetration rate increasing tool longevity, trips for tool failure hence reduction in section delivery time.This paper details the features of the i-Trak torque and drag, Dynamic management and hole cleaning models capable of drive efficiencies to execute effectively and consistently each operations while meeting the goals set in the AFE.The technology was first deployed in Abu Dhabi (UAE) in xx Field, a producing conventional oil field located onshore and operated by ADNOC ONSHORE. In total 27083ft was achieved combining Well-I and Well-II where the objectives behind these 2 horizontals wells were to maximize reservoir contact, improve productivity and accelerate delivery while minimize construction costs by implementing mitigations in addressing concerns which helped in streamlining the drilling operations while reducing any potential risks. These wells were drilled in collaboration by ADNOC and Baker Hughes and considered to be the first maximum reservoir contact (MRC) project in this area.For primary mitigation, the output of cuttings mass existing in the wellbore (static and mobile) can give a clear indication of the amount of cuttings downhole which corresponds to 50% of the criteria analysis for an inclination range. Secondary mitigation is from the high-resolution torque and drag samples plotted real-time and compared against theoretical pre-well plan broomstick model for different frictions factors measuring the deviations to concisely convey the end users to apply the required procedures to alleviate risks of well constructions operations.Finally, the integration of dynamic management provides a unified user interface which combines ROP and VSS measurements in a single place to minimize maintenance and repair costs while driving higher ROP's.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3